top of page

Heating installation

The heating installation in the church is now complete. The church was “handed over” to us last Tuesday to the admiration and satisfaction of all. We will not immediately feel the full benefit because it will be some time before the boiler room is stripped out and rebuilt. But there is a steady background heat even on the coldest days. I recommend that when you return to church next week you do continue to come well wrapped-up. For it seems that ventilation is one of the best means of keeping the dreaded covid away. All the church windows will be wide open. Summer come quickly, with an end to the menace that hangs over us!



Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page